← Top Rep Training hub

Top Rep Training · Task doc

Top Rep 101 Ops Scope — Paul GHL build review

Complex ·ClickUp: in progress ·Open in ClickUp ↗ ·Updated 2026-08-03
What this task isReview the Top Rep 101 scope doc Section 2 and flag GHL conflicts before any build starts — covers pipeline structure, custom field placement, post-purchase automation, 8 pre-work email templates, LearnWorlds provisioning steps, and ClickUp build scoping. No building yet; feedback and validation only.
The Request

Top Rep 101 is a new product. Ashlee has already been selling it and we've been onboarding clients using the 1-on-1 Coaching process in the meantime. This scope doc is our first attempt to formalize the GHL build — details may still change.

We'll be discussing this on the VA coaching call tomorrow. Please come with questions.

Your ask: Review Section 2 of the scope doc (GHL / Scaling Engine build requirements) and flag anything that doesn't align with how we currently process other products in GHL before you start building. Do not build anything yet — review and feedback first.

Specifically, Paul needs to: Review and validate the proposed pipeline structure (post-sale ops only, no selling stages) Confirm whether the suggested custom fields can be created at the contact or opportunity level — and which is correct for our setup Review the post-purchase automation and flag any conflicts with existing GHL workflows Load the 8 pre-work email templates from the spreadsheet into GHL as email templates attached to pipeline stage triggers Confirm the exact LearnWorlds provisioning steps for adding reps to Flight School Elite — flag if any part can be automated Build the ClickUp Top Rep 101 task template based on the existing 1-on-1 Coaching template (task ID: 86dy6u5yx) with additions/adaptations listed in Section 2 of the doc Flag any open questions in the doc comments or on this task before building

📄 Scope doc: https://app.clickup.com/9008140728/docs/8ceumdr-59477

📊 Curriculum & session detail spreadsheet (pre-work email copy is in Tab 3): https://docs.google.com/spreadsheets/d/1IkXKXocSF0sk3xzkOfFihjA9AoXX2hVfwBhmvbee0Ss/edit?gid=19024880#gid=19024880

Due 2026-07-31

Build Plan

Not planned yet.

Accomplishment Report

Not built yet.

Compiled by Dispa · Top Rep Training